skip to main | skip to sidebar

r corbo construction

Friday, December 7, 2007


We received a call for an insurance estimate on this burn out. The house exploded after a water heater flame ignited polyurethane fumes produced by floor refinishing work.
Posted by R Corbo Construction at 6:09 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2009 (5)
    • ►  November (2)
    • ►  March (3)
  • ►  2008 (25)
    • ►  November (1)
    • ►  October (2)
    • ►  September (2)
    • ►  August (1)
    • ►  July (3)
    • ►  June (3)
    • ►  May (3)
    • ►  April (3)
    • ►  March (4)
    • ►  February (1)
    • ►  January (2)
  • ▼  2007 (16)
    • ▼  December (7)
      • An asphalt roof never looked so good.
      • We finished the roof rafters at 10 am, 12-21-07 a...
      • We received a call for an insurance estimate on t...
      • It felt good to finish the wall framing, especiall...
      • The walls take shape. There will be loads of wind...
      • Finally, we get to frame; first the sill, then th...
      • After the foundation inspection we poured the sla...
    • ►  November (8)
    • ►  October (1)

About Me

R Corbo Construction
View my complete profile