We finished the roof rafters at 10 am, 12-21-07 and the roofers decked and shingled the job by 5 pm. With the addition under roof we can enjoy our holiday week knowing all is protected. I am sure the Barrs share the feeling.
Friday, December 7, 2007
We received a call for an insurance estimate on this burn out. The house exploded after a water heater flame ignited polyurethane fumes produced by floor refinishing work.
It felt good to finish the wall framing, especially on a Friday afternoon. We end the week and start the weekend with a sense of accomplishment.
Wednesday, December 5, 2007
The walls take shape. There will be loads of windows, wait and see.
Saturday, December 1, 2007
Finally, we get to frame; first the sill, then the ledger, next the joists. Once the plywood is on we'll have a platform to work off. Life will be good.
After the foundation inspection we poured the slab. Danny never made it out!