Friday, May 23, 2008

Theater in the Round



The walls get laid out, then assembled and erected.

Friday, May 16, 2008

The Breakthrough


The house didn't fall down and the floor height from new to old is dead on.

Friday, May 9, 2008

Framing The Addition



After two weeks rebuilding/leveling the existing floor system and installing five paralams to secure the two floors above, we finally made it outside to begin framing the addition-hallelujah!

Sunday, April 20, 2008


The new foundation is ready to go, but the interior will require work. Numerous joist are rotten and will need to be repaired before we can finish leveling the space. Three support beams will need new posts.

Saturday, April 12, 2008

A Sixteen Sided Polygon


It takes a little bit of trigonometry to find the dimensions of one of sixteen equal triangles. A template representing the triangle simplifies the foundation layout.

Thursday, April 10, 2008

The footing is complete.
We're counting on a lucky horeshoe to make all things right.
We start again in the ground.